Some Past Field Services Project Examples

Dynamo was retained to perform all required engineering and design requirements to meet all utility needs including plans review, grounding and bonding design, cable routing, and cable capacities.

Dynamo was retained to perform all required engineering and design requirements to meet all utility needs including plans review, grounding and bonding design, cable routing and cable capacities.

The primary objective of the Utility Power Upgrade Project was to install two (2) three-winding 230 kV power transformers to carry the site load and allow de-energization of the existing 72–4.16 kV substation.

The primary objective of the Utility Power Upgrade Project was to install two (2) three-winding 138 kV power transformers to carry the site load and allow de-energization of the existing 72–4.16 kV substation.

Dynamo completed a design-build of a new 138 kV client-owned substation with a unique 138 kV underground transmission line designed to provide additional clearance for site operations.