SERVICES
Dynamo designed a greenfield substation and medium voltage distribution for a canola processing facility near Yorkton, SK.
SERVICES
Sectors
Dynamo designed a greenfield substation and medium voltage distribution for a canola processing facility near Yorkton, SK.
Dynamo was retained to fabricate, ship, and install a 9.6 m x 4.5 m control building for the Grenfell Substation. Drawings were supplied by Dynamo based on a preliminary design provided by SaskPower.
Dynamo has successfully completed substation steel fabrication and on-site structure erection including aluminum bus work at multiple greenfield and brownfield locations for SaskPower since 2010.
Dynamo was contracted to execute a 138 kV substation expansion and 25 kV capacitor addition to ABB’s Static Var Compensation installation at SaskPower’s Points North Substation.
Dynamo was retained to remove seven (7) 230 kV air circuit breakers and current transformers (CTs) and replace them with new SF6 live tank circuit breakers and CTs.
Dynamo has successfully completed substation steel fabrication and on-site structure erection including aluminum bus work at multiple greenfield and brownfield locations for SaskPower since 2010.