The primary objective of the Utility Power Upgrade Project was to install two (2) three-winding 230 kV power transformers to carry the site load and allow de-energization of the existing 72–4.16 kV substation.

The primary objective of the Utility Power Upgrade Project was to install two (2) three-winding 138 kV power transformers to carry the site load and allow de-energization of the existing 72–4.16 kV substation.

Dynamo completed a design-build of a new 138 kV client-owned substation with a unique 138 kV underground transmission line designed to provide additional clearance for site operations.

Dynamo completed a design-build 138 kV substation as part of the Melt Shop expansion project at the Regina facility.  Deliverables included detailed engineering, installation of all piles, foundations, then fabrication and installation of structural steel, and steel pile caps. 

Dynamo was originally retained by Yara to perform a scoping study to evaluate present and future loading requirements.  Based on future plant increases and aging electrical infrastructure, the study recommended the installation of two (2) new, fully redundant 138–13.8 kV transformers and a new 13.8 kV switchgear line-up.