Dynamo was retained to complete upgrades to the Pasqua Switching Station.
SERVICES
Sectors
Dynamo was retained to complete upgrades to the Pasqua Switching Station.
Dynamo was retained to complete a 138 kV and 230 kV expansion in a brownfield setting, to the Kennedy Switching Station.
Dynamo completed electrical and civil deficiencies resulting from the L3R project. Tasks included cable management, cathodic grounding, clean-up and washdown of all pumphouses, widening of the roadway, ditch markings, and structural modifications to existing the stairwell.
Dynamo was contracted to execute a 138 kV substation expansion and 25 kV capacitor addition to ABB’s Static Var Compensation installation at SaskPower’s Points North Substation.
The primary objective of the Utility Power Upgrade Project was to install two (2) three-winding 230 kV power transformers to carry the site load and allow de-energization of the existing 72–4.16 kV substation.
The primary objective of the Utility Power Upgrade Project was to install two (2) three-winding 138 kV power transformers to carry the site load and allow de-energization of the existing 72–4.16 kV substation.